StormTank
Installation
- Heights are checked, fall is established and the site is levelled to suit the tank system.
- StormTanks are connected together in position with access ports installed as required.
- Grated pits are installed and connected into the StormTank system, down pipes and discharge point.
- Concrete is poured to the required depth allowing for completion of the final patio, driveway or paving.