StormTank

Installation

  • Heights are checked, fall is established and the site is levelled to suit the tank system.
  • StormTanks are connected together in position with access ports installed as required.
  • Grated pits are installed and connected into the StormTank system, down pipes and discharge point.
  • Concrete is poured to the required depth allowing for completion of the final patio, driveway or paving.